Alyeska Pipeline Strategic Reconfiguration

NGE-TFT conducted geotechnical evaluations, provided oversight for pile installation, and designed a septic outfall system at five TransAlaska pump stations.

Details

Name: Alyeska Pipeline Strategic Reconfiguration

Tags: Geotehnical Engineering, Pipeline

Alyeska Pipeline Strategic Reconfiguration

NGE-TFT performed preliminary geotechnical evaluations and developed foundation recommendations for the pile design efforts in association with the Strategic Reconfiguration efforts at five of the twelve pup stations along the TransAlaska oil pipeline. NGE-TFT also provided engineering oversight during pile installation at each of the five pump stations. We designed a septic effluent outfall system for Pump Station #4 which included a thermal analysis and monitoring of the proposed outfall system as well as construction oversight for outfall system.