Seic Phase II Onshore Pipeline

NGE-TFT provided geotechnical expertise for 17 fault crossings on the Sakhalin Island pipeline, including slope stability, drainage, and trench construction monitoring.

Details

Name: Seic Phase II Onshore Pipeline

Tags: Geotehnical Engineering, Pipeline

Seic Phase II Onshore Pipeline

NGE-TFT provided on-site geotechnical engineering expertise to 17 separate fault crossings along the 785km oil and gas pipeline construction effort on the Sakhalin Island, Russia. Duties consisted of slope stability evaluations, drainage adequacy determinations, and right-of-way re-instatement and special trench construction monitoring and inspection.